Scheduling Around Real Constraints
DevelopmentPosted on Aug 19, 20258 Min to read
- Industry
- Utilities
- Tech Stack
- Node · Postgres
- Timeline
- 13 weeks
- AI Effective Rate
- 52%
A schedule that ignores whether the engineer carries the right part is not a schedule. It is a list of second visits.
Constraints first
Skills, stock and travel entered the solver as hard constraints. Optimising the wrong objective quickly is worse than optimising the right one slowly.